Wed 20 Feb 2008

  BFL

The final inspection was done today and we now have the permanent certificate of occupancy.  The last thing to be done is the final paint on the right turn lane-tomorrow.  The landscaping is progressing and is about 75% done.  The final planting is in the retention basin and because it is still a muddy mess they can't get in until it drys out.  By the end of next week it should be done.  God's blessings are being poured out on his children.



Posted by Michael_Nie on Wed 20 Feb 2008 6:44:49 pm     | no comments

---------------------------------------------------------------------------------------------------------------

Sat 2 Feb 2008

  BFL

Final inspections done, bond for the temp certifcate posted, we are a go for occupancy and can get to work doing what the Lord has commanded.  We have 30 days to finish all work on the parking lot, including the landscaping, to convert to a full cert.  God is blessing the work.



Posted by Michael_Nie on Sat 2 Feb 2008 10:14:57 am     | 2 comments

---------------------------------------------------------------------------------------------------------------

Thu 31 Jan 2008

  BFL

Whoa, the last two days have been like finals in college.  Today the inspecter went over the parking lot, the roof, electrical, and irrigation.  We have to again make some minor adjustments but passed.  He will be on site tomorrow to make sure the safety items he down checked are resolved-they are or will be by tomorrow.  after the inspections the last of the paperwork will be filed and the temp C of O will be issued.  God is great.



Posted by Michael_Nie on Thu 31 Jan 2008 9:05:31 pm     | no comments

---------------------------------------------------------------------------------------------------------------

Thu 31 Jan 2008

  BFL

Building inspection went well.  Have several items to correct but all are an easy fix.  Will continue with roof, parking and landscaping today.  C of O is targeted for Friday.  The inspecter was very positive about us passing. 



Posted by Michael_Nie on Thu 31 Jan 2008 6:33:37 am     | no comments

---------------------------------------------------------------------------------------------------------------

Tue 29 Jan 2008

  BFL update

Final inspection scheduled for tomorrow Jan. 30.  If inspection early enough I will be able to get the request for the certificate of occupancy in then but by Thursday it will be done.  Keep your eye on the prize.



Posted by Michael_Nie on Tue 29 Jan 2008 4:20:16 pm     | 1 comments

---------------------------------------------------------------------------------------------------------------

Fri 25 Jan 2008

  BFL

Groundskeeper has layed the main lines and electrical wire for the irrigation system.  Site visit from the civil engineer, Craig Hunt, went over some changes he would like to see.  They are centered on the retention basin and are correctable.  The electrician finished the parking lot light poles and replaced a defective switch in the bathroom between the youth classrooms.  Checked with the county but they have not signed off on the items filed yesterday.   Head walls for the drainage poured. 



Posted by Michael_Nie on Fri 25 Jan 2008 7:06:46 pm     | no comments

---------------------------------------------------------------------------------------------------------------

Thu 24 Jan 2008

  BFL

Special inspection reports filed with the county, final fire inspection filed, all field test reports on the imported fill and concrete filed.  Now its wait and see how long it takes to review and approve so we can schedule the final building inspection.  County sign and paint units involved in placement of paint on the roadway and replacement of signage on shoulder of La Cholla need to review and approve our plans and will contact as soon as they are available.  Groundskeeper will start the main lines and electrial wireing to valve boxes tomorrow.  Rip rap is 90% and should be finished by Sat.   



Posted by Michael_Nie on Thu 24 Jan 2008 8:34:23 pm     | no comments

---------------------------------------------------------------------------------------------------------------

Wed 23 Jan 2008

  BFL

County inspection of the head walls/culverts done and passed, will pour cement as soon as the asphalt is cured out.  Volunteers helped today with cleaning tables, helping Mike Gray with the tops for the service tables.  Last of painting, patching ect done. 



Posted by Michael_Nie on Wed 23 Jan 2008 5:52:49 pm     | no comments

---------------------------------------------------------------------------------------------------------------

Tue 22 Jan 2008

  BFL

We have pavement.  The entry is paved, the right turn lane is paved and all the patching in the parking lot is done.  Head walls are formed and ready to be poured as soon as the asphalt is hard enought to bear the weight.  Rip rap coming along just fine.  Filing the special inspection reports with the county tomorrow and then we can schedule the final inspection for the end of the week.   



Posted by Michael_Nie on Tue 22 Jan 2008 6:14:44 pm     | no comments

---------------------------------------------------------------------------------------------------------------

Mon 21 Jan 2008

  BFL

The front entry is ready to be paved-tomorrow.  The large rip rap pad is 90% done, the next largest is done.  All sleeving is under the pavement and will be repaired tomorrow.  Most of the repair and repaint is done-staff bathroom and the east bathroom need to be finished.   Received the final soils report and will file it with the county tomorrow-that enables the final county inspection to be scheduled Thursday.  God moves when his people trust and obey his word.



Posted by Michael_Nie on Mon 21 Jan 2008 7:57:44 pm     | no comments

---------------------------------------------------------------------------------------------------------------